Accutron

Nitrous Oxide-Oxygen Sedation Systems

Field Preventative Inspection Testing F1224 Rev 02

Inspection Testing

1 Page

Customer Name: ___________________________________________________________  1733 W Parkside Lane Phoenix, AZ 85027 Ph: 623-780-2020 website: www.accutron-inc.com  Address: __________________________________________________________________  Step  Item / Function  1  Physical Check  2  Tubing and Rubber Goods  3,4  Leak Check 1 (outspout)  5,6  Leak Check 2 (air override, tubes, joints)  7  Non-rebreathing Replace non-rebreathing (outspout) leaf. No testing valve required.  9  Oxygen Flush  10  Failsafe Test  11  O2 Flow Point 1  12  O2 Flow Point 2  15,16 13,14  SN:  N2O Flow Point 1  17  Model#:  Percent N2O Control  Ball style (PC,DC,CM only) - O2 at 6 lpm and N2O at 6 lpm. Verify Nitrous % knob at 50% per procedure. (non-critical if flow tubes pass previous 4 test steps)  [ ] Return to Accutron for repair [ ] Customer chooses to keep unit and rely on flow tubes since %knob is only an aid. Customer Signature:  18  Pass (P) Fail (F)  Meter Desc:  O2 Resuscitator (100 lpm min)  Plug fixture into resuscitator outlet. Verify min flow in fixture  [ ] Return to Accutron for repair [ ] Customer chooses to keep unit, believes current flow meets emergency needs. Customer Signature:  N2O Flow Point 2  Final Status:  Requirement / Test Actions  Possible Corrective Actions if Test Fails  Check for damaged components (list parts here)  [ ] Non-critical (Cosmetic) damage, use as is [ ] Return to Accutron  Check for tears, cracks, holes, etc (list parts here)  [ ] Order parts (Remove from service until new parts arrive, no need for follow-up) ______________________________________________________________________  With gas supply connected and unit off, soap outspout  [ ] Return to Accutron for repair [ ] Customer keeping unit, is aware it might increase ambient levels of N2O in room and cause some gas loss. Customer Signature:  With gas supply connected and unit flowing 4 lpm of each gas, soap override in two places per procedure, (PC/DC only) test joints per procedure  [ ] Return to Accutron for repair [ ] Customer keeping unit, is aware it might increase ambient levels of N2O in room and cause some gas loss. Customer Signature: [ ] Non-rebreathing leaf replaced  Minimum flow of 20 lpm  [ ] Return to Accutron for repair [ ] Customer accepts Flush as is. Customer Signature:  Both gases to 4 lpm flow. Shut oxygen supply at source. Verify all flow stops (digital gives Failure Oxygen alarm)  [ ] Stop using and return to Accutron for repair  Ball style meters - O2 3 lpm. Verify fixture 3 lpm. Digital - Total Flow 3 lpm %N2O at 0. Verify fixture 3 lpm.  [ ] 1st test failed. Gas supply was low. After correcting supply unit passed retest. [ ] Proper flow could not be achieved, return to Accutron for repair  Ball style meters - O2 6 lpm. Verify fixture 6 lpm. Digital - Total Flow 6 lpm %N2O at 0. Verify fixture 6 lpm.  [ ] 1st test failed. Gas supply was low. After correcting supply unit passed retest. [ ] Proper flow could not be achieved, return to Accutron for repair  Ball Style - O2 3 lpm, N2O 3 lpm. Verify fixture 6 lpm. Digital - Total flow 6 lpm, %N2O 50%. Verify fixture 6 lpm. Ball Style - O2 6 lpm, N2O 6 lpm. Verify fixture 12 lpm. Digital - Total flow 9.9 lpm, %N2O 70%. Verify fixture 9.9 lpm.  [ ] 1st test failed. Gas supply was low. After correcting supply unit passed retest. [ ] Proper flow could not be achieved, return to Accutron for repair  [ ] Meets minimum requirements  Tested by: __________________________________ Date: _______________  [ ] 1st test failed. Gas supply was low. After correcting supply unit passed retest. [ ] Proper flow could not be achieved, return to Accutron for repair  [ ] Fails minimum requirements, return to Accutron for repair Test fixture # _________________ Fixture Calibration Due Date: __________________  Comments:  F 1224 rev02  CN#:CN-0646  Field Certification Test Sheet  Accutron, Inc. MASTER
File Type: PDF
File Size: 214 KB
File Name: field_preventative_inspection_testing_f1224_rev_02.pdf

By clicking Download you are confirming this is the correct document for your purposes
and that you agree to our Terms & Conditions