Millipore Corporation
Synergy System User Manual V2.0
User Manual
48 Pages
Preview
Page 1
Synergy® system Synergy UV system User manual
Notice The information in this document is subject to change without notice and should not be construed as a commitment by Millipore Corporation. Millipore Corporation assumes no responsibility for any errors that might appear in this document. This manual is believed to be complete and accurate at the time of publication. In no event shall Millipore Corporation be liable for incidental or consequential damages in connection with or arising from the use of this manual. We manufacture and sell water purification systems designed to produce pure or ultrapure water with specific characteristics (S/cm, T, TOC, CFU/ml, Eu/ml) when it leaves the water purification system provided that the Synergy Systems are fed with water quality within specifications, and properly maintained as required by the supplier. We do not warrant these systems for any specific applications. It is up to the end user to determine if the quality of the water produced by our systems matches his expectations, fits with norms/legal requirements and to bear responsibility resulting from the usage of the water.
Copyright 2011 MILLIPORE CORPORATION. PRINTED IN FRANCE. ALL RIGHTS RESERVED. THIS BOOK OR PARTS THEREOF MAY NOT BE REPRODUCED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF THE PUBLISHERS. FTPF09574 V2.0 – 10/2011
Trademarks Millipore, Synergy, EDS-Pak and Elix are registered trademarks of Millipore Corporation. Millipak and BioPak are registered trademarks of Millipore Corporation. SynergyPak 1, SynergyPak 2, SynergyPak 3 and VOC-PAK are trademarks of Millipore Corporation. The “M” Mark is a trademark of Merck KGaA. All other trademarks are trademarks of their respective manufacturers.
Product warranty and limitation of liability The applicable warranty and limitation of liability for the products listed in this publication may be found at http://www.millipore.com/ec/cp3/terms within the "Terms and Conditions of Sale" applicable to your purchase transaction.
Directive 2002/96 EC: For European users only The symbol “crossed bin” on a product or its packaging indicates that the product should not be treated like household waste when discarded. Instead the product should be disposed of at a location that handles discarded electric or electronic equipment. Proper disposal of equipment containing electric or electronic components will help to reduce pollution effects to the environment or to human health. Proper recycling of these products helps in environmental preservation and helps to protect natural resources. For more information about recycling of products containing electric or electronic components, please contact your local recycling representative or organisation.
Table of Contents Introduction ... 1 Using this Manual ... 1 Safety Information ... 1 Contacting Millipore... 2
Product Information... 3 Synergy System Overview ... 3 Synergy System Product Water Specifications... 3 Schematic of Main Components ... 4 Operating principle ... 4 Technical Specifications ... 5
Pre Installation ... 7 Installation Requirements ... 7 Optional Equipment You May Need ... 7 Unpacking the Synergy System What’s Inside?... 7
Installation ... 9 Preparation of the System ... 9 Connection of Tubing ... 9 Connection of the Power Cord Turning on the System Power ... 11 Installation of the SynergyPak cartridge... 12 Installation of the Tygon® Tubing... 14 Purging Air from the System... 15 Hydrating the System... 15 Installation and Rinsing of the Final Filter... 16 How to Calibrate the Flowrate from the Synergy System (F02) ... 17 How to Show Resistivity or Conductivity Units (C01) ... 19 How to Set the Resistivity Setpoint (C02)... 20
Using the Synergy System ... 21 Understanding the Display... 21 How to Get Water from the Synergy System... 21 How to Dispense an Exact Amount of Product Water (F01)... 22 Operating Modes ... 23 How to view the Product Resistivity and Temperature in Pre Operate mode ... 25 How to recirculate water manually before dispensing ... 25 How to Understand Synergy System messages... 26
Maintenance... 27 Maintenance Schedule... 27 In order to maintain good performance of your water system respect the maintenance schedule and replace consumables as required. ... 27 How to Replace the SynergyPak cartridge ... 28 How to Replace the Final Filter ... 31 How to Clean the Screen Filter... 32 How to Replace the UV Lamp (UV System only) ... 33 How to View or Reset the UV Lamp Timer (C03) ... 36
Troubleshooting... 39 Ordering Information ... 41 Catalogue Numbers for Synergy Systems ... 41 Catalogue Numbers for Consumables... 41 Catalogue Numbers for Accessories... 41
Introduction Using this Manual This User Manual is a guide for use during the installation, normal operation and maintenance of a Synergy System or Synergy UV Water Purification System. ‘Synergy’ is used in this manual to refer to either the Synergy or the Synergy UV System unless otherwise noted. It is highly recommended to completely read this manual and to fully comprehend its contents before attempting normal operation or maintenance of the Water Purification System.
Safety Information Your Synergy System should be operated according to the instructions in this manual. In particular, the hydraulic and electrical specifications should be followed and met. It is important to use this equipment as specified in this manual; using this equipment in a different manner may impair the safety precautions of the Synergy System. Symbol
What it means This HAZARD symbol is used to refer to instructions in this manual that need to be done safely and carefully.
This ATTENTION symbol is used to refer to instructions in this manual that need to be done carefully.
This UV RADIATION sticker is used to refer to a position on the system cabinet or inside of it where exposure to UV light is possible.
This DANGER sticker is used to refer to a position on the system cabinet or inside of it that could be hazardous.
This ELECTRICAL GROUND sticker is used to refer to a position on the system cabinet or inside where an electrical ground connection is made.
This ELECTRICAL DANGER sticker is used to refer to a position on the system cabinet or inside where an electrical danger could exist.
1
Introduction Contacting Millipore Internet The Millipore Internet Site can be used to find addresses, telephone/fax numbers and other information. Internet Site Address: www.millipore.com www.millipore.com/techservice
Manufacturing Site Millipore SAS 67120 Molsheim FRANCE
2
Product Information Synergy System Overview DISPLAY The DISPLAY is used to monitor the water quality and system status.
DISPENSING BUTTON
KEYPAD
The DISPENSING BUTTON is used to get Product Water.
The KEYPAD is used to access operating functions and system settings.
Synergy System Product Water Specifications Water Flowrate Specifications
Up to 1.5 LPM (with Final Filter)
Product Water Quality
Resistivity Total Organic Carbon (TOC) Micro-Organisms
18.2 M.cm @ 25 C < 5 g/L (ppb) (with UV) < 10 g/L (ppb) (without UV) < 0.1 CFU/ml (with Final Filter)
3
Product Information Schematic of Main Components
1 Inlet Solenoid Valve 2 Booster Pump 3 UV Lamp 185 nm (UV System) 4 SynergyPak 1, 2 or 3
5 Product Resistivity Cell 6 Point-of-Use (POU) Solenoid Valve 7 Recirculation Loop 8 Final Filter
Operating principle The Synergy Water Purification System is fed with pretreated water (Elix, RO, distilled or DI water) coming from a tank or a loop. When Product Water is being dispensed, the Inlet Solenoid Valve opens and the Booster Pump turns on. The pretreated water is then pumped into the UV Lamp (UV System). The UV Lamp emits light at 185 nm and 254 nm. It is used to reduce levels of organic molecules in the water. The UV Lamp is a consumable device that needs to be periodically replaced during the maintenance of the system. The water is then sent to the SynergyPak cartridge to deionize the water. There are three types of SynergyPak cartridge. SynergyPak 1 is used for RO, distilled or Elix feedwater. SynergyPak 2 is used for pretreated water from clean DI (particulate-free). SynergyPak 3 is used for pretreated water from dirty DI (non particulate-free). The SynergyPak cartridge is a consumable device that needs to be periodically replaced during the maintenance of the system. The Final Filter is a membrane based filter that removes all particles and bacteria with a size greater than the filter pore size. The Final Filter is a consumable device.
4
Product Information Technical Specifications Dimensions
System Height, Width and Depth
54 cm
14.9 cm 29.0 cm
38 cm
Shipping Box Height: 56 cm Width: 42 cm Depth: 64 cm
Weight
System Operating Weight Dry Weight Shipping Weight
Synergy 8.8 kg 5.3 kg 9.5 kg
Synergy UV 9.4 kg 5.9 kg 10.1 kg
Noise Level
A Synergy System has a maximum noise level of 36 dB at a distance of 1 metre away.
Electrical
100 VAC 10%, 50/60 Hz. 0.56 amp source, 2 amp T (Time Lag) fuse, Power = 56 VA 120 VAC 10%, 50/60 Hz. 0.56 amp source, 2 amp T fuse, Power = 56 VA 230 VAC 10%, 50/60 Hz. 0.31 amp source, 2 amp T fuse, Power = 77 VA The source of electrical power should be within 2.5 metres of the system. The source of electrical power must be earth grounded.
5
Pre Installation Installation Requirements Feedwater Requirements
Type of Feedwater Flowrate Minimum Pressure Maximum Pressure Temperature Conductivity TOC
Elix, RO, distilled or DI water 1.5 LPM (Litres per minute) > 0 bar (Feed from a tank) 0.5 bar 5 to 35 C < 100 S/cm < 50 ppb
NOTE: If the feedwater pressure is greater than 0.5 bar, then the Pressure Regulator (ZFMQ000PR) is required.
Feedwater Connection Needed
Feedwater Piping Connection
Environmental Requirements
Indoor Use Only Storage Temperature Operating Temperature Relative Humidity Altitude Installation Category Pollution Degree
1/2 inch Male GAZ, NPTM or BSPM
5 C < T < 40 C 5 C < T < 40 C Should not exceed 80% for temperatures below 31 C Should stay within 50% to 80% between 31 C and 40 C. < 3000 metres II 2
Optional Equipment You May Need Wall Mounting Bracket
The Millipore Catalogue Number for the Wall Mounting Bracket is WMBSMT002. The mounting hardware for attaching the bracket to a wall is not included and must be supplied.
Unpacking the Synergy System What’s Inside? Open the Synergy System Shipping Box. Use the checklist included in the Accessories Bag to make sure all items were shipped and are accounted for. It is highly suggested to become familiar with the items that are shipped since these will be used in the Installation section of this manual.
Contact Millipore if an item is missing.
7
Installation Preparation of the System A
Open the front cover. (this may require to remove the final filter) Locate the tie wrap used to hold the Booster Pump in place during shipping (A).
B
Press on the tab of the tie wrap (B). Remove and pull the tie wrap out.
C
Locate the protective foam found at the UV lamp cable. Remove it (C).
Connection of Tubing A
Rotate the Synergy System so you can see the back of the system (see photo A).
Feedwater tubing
9
Installation Feedwater Tubing B
Locate the Feedwater Tubing exiting from the bottom of the system (B). A 1/2 inch Female GAZ fitting with a screen filter is attached at the end of this tubing. Unroll it until the fitting reaches the Feedwater source. Apply white tape on the thread of the 1/2 inch Male GAZ valve or fitting of the Feedwater source.
C
10
Connect the fitting to the valve (C).
Installation Connection of the Power Cord Turning on the System Power A
Open the front cover of the system (A). (this may require to remove the final filter) This will allow the system to go into STANDBY mode once the system is powered.
B
Plug the Power Cord into the system (B). Plug the other end of the Power Cord into an appropriate source of electrical power (i.e. wall outlet). The system is immediately powered. Open the Feedwater Supply Valve.
Start-up Displays C
Once the system is powered, the system will start to display information about the software before going into STANDBY mode (C).
11
Installation Installation of the SynergyPak cartridge HAZARD
Do not touch the UV Lamp when replacing the SynergyPak cartridge.
Installation A
Make sure the front cover is opened. STANDBY should be viewed on the Display (A). Remove the SynergyPak cartridge from its shipping box. Remove the protective caps on the ports of the SynergyPak cartridge and from the system.
B
12
Locate the O-rings on the ports (B). Wet them with water. It is preferable to wet them with ultrapure water.
Installation C
Install the SynergyPak cartridge until it is fully seated into the system ports as shown (C, D).
D
E
CLOSE THE FRONT COVER.
13
Installation Installation of the Tygon® Tubing ATTENTION
A
Do not use any white tape on the threads of the Barbed Fitting. An O-ring is located inside the POU Dispenser to ensure water tightness between the threads of the POU Dispenser and the Barbed Fitting. Locate the clear Tygon Tubing and the Barbed Fitting from the Accessories Bag. Screw the Barbed Fitting onto the bottom end of the POU Dispenser (A).
B
14
Push one end of the Tygon Tubing onto the end of the Barbed Fitting (B). Place the other end of the Tygon Tubing in a sink.
Installation Purging Air from the System A
At this time you should have installed the SynergyPak cartridge, Barbed Fitting and the Tygon Tubing. Air trapped in the SynergyPak cartridge should now be purged from the system. Press the Dispensing Button once to put the system into DISPENSING mode (A). Dispense about 3-4 Litres of water from the system.
Hydrating the System At this time, the Final Filter is not installed. Leave the system overnight or for several hours in PRE OPERATE mode (see Section Operating Modes). The system will regularly recirculate water and rinse off purification media inside the SynergyPak cartridge. Do not leave the system in STANDBY mode. (The next morning) Press the Dispensing Button once to put the system into DISPENSING mode. Allow about 1 Litre of water to be dispensed from the system. Press the Dispensing Button once again. The system will finish dispensing water. Remove the Tygon Tubing and the Barbed Fitting from the POU Dispenser. The Final Filter needs to be installed.
(See Section Installation and Rinsing of the Final Filter).
15
Installation Installation and Rinsing of the Final Filter Obtain a Final Filter. It can be the Millipak® Express 20 or the BioPak® Ultrafiltration Cartridge.
A
Remove the Tygon Tubing and the Barbed Fitting from the POU Dispenser. Screw the Final Filter onto the end of the POU Dispenser. The Final Filter should be turned until it is hand tight (A). Do not over tighten the Final Filter.
ATTENTION
Do not use white tape on the threads of the Final Filter. The POU Dispenser has an O-ring inside which provides a watertight seal. Press the Dispensing Button once. This will bring the system into DISPENSING mode.
B
Locate the air vent valve (not present on all types of Final Filters) on the top side of the Final Filter. Open this slowly but do not remove it.(B). Allow any air on the clear side of the Final Filter to be vented out.
ATTENTION
Air will not pass through the membrane filter in the Final Filter. If there is trapped air, then a reduction in Product Water flowrate can result. Dispense about 1 Litre of water. Make sure all air is purged out. Press the Dispensing Button once again. The system will finish dispensing water. Leave the system in PRE OPERATE mode.
ATTENTION
It is highly recommended not to put Tygon Tubing or any other type of tubing on the end of the Final Filter. This can compromise the Product Water quality (bacteria can grow in the Tygon Tubing). The Water System is now ready for use.
16
Installation How to Calibrate the Flowrate from the Synergy System (F02) Before calibrating the Product flowrate from the Synergy System, you will need a 1 Litre graduated cylinder to measure the total volume of water that will be dispensed. The Final Filter should be installed. 1
Press the Main and “-“ Buttons together to enter the menu. The Display will show F01.
2
Press the Main Button once. The Display will show F02 and the 60 second timer. The graduated cylinder will be blinking.
3
Press the Dispensing Button once. The system will dispense water for 60 seconds. The Display will show the timer counting down.
Continued on next page
17