INO Therapeutics

INOvent

INOvent Pre-Use Checkout

Pre-Use Checkout

2 Pages

INOvent Pre-Use Checkout ®  For details of this procedure reference the Operation and Maintenance Manual Section 5/ Pre-Use Procedure Important:  This guide is provided for general information only and is not a substitute for the Operation and Maintenance Manual. Refer to the manual for detailed information. 24 hour Technical Support Tel. 877.566.9466  Step I: High Pressure Leak Test Turn the INOvent delivery system ON and make sure the buzzer and speaker sound. Wait until monitor displays numeric values for NO/NO2/O2 (make sure manual bagging flowmeter is turned off). Perform high pressure leak test. Inspect all gas connections, verify the white plastic (Kel-F) tip, on the end of the regulator hose, is in place and not damaged. Connect the regulator to the INOmax® treatment cylinder and to the quick connect on the INOvent. Open and then close the INOmax cylinder valve. Monitor pressure gauge for 30 seconds for any signs of leakage. Repeat the process using the second regulator assembly. Note: The pressure drop leak test will not detect leaks at the cylinder valve outlet connection because of the check valve in the regulator hose. If a leak is suspected, see the O&M manual Section 13/ Appendix B.  Step II: Low Range Calibration  (refer to page 4-2 in the O&M Manual for details)  Perform Low Range Calibration.  Step III: Purge Assemble connectors and tubing as shown in Diagram #1 for this procedure. Ensure the INOmax regulator is pressurized and the cylinder valve is closed.  Be sure a purge has been completed within five minutes before the start of NO therapy.  Using a flowmeter from the wall or a cylinder source, set the oxygen flow to 15 L/min. Purge INOvent Delivery System. Set the NO dose to its maximum concentration (80 ppm). Cylinder gauge pressure will drop slowly to 0 psi. Measured NO2 will increase, and then decrease as NO2 is purged from the system. "Low NO/N2 Pressure" and the "Delivery Failure" alarms will occur. The purge is now complete.  (Connected to wall/tank)  Diagram #1
File Type: PDF
File Size: 729 KB
File Name: inovent_pre-use_checkout.pdf

By clicking Download you are confirming this is the correct document for your purposes
and that you agree to our Terms & Conditions