Marquette

Giraffe, Lullaby and Panda Neonatal Systems

Giraffe Incubator Service Checkout Procedure Rev 2

Service Checkout Procedure

16 Pages

Giraffe Incubator Service Checkout Procedure  1.1 Installation For units shipped with the Servo Oxygen option, the Oxygen Cells are shipped separately and must be installed at the time of product installation. Be sure to complete the procedures in Incubator service manual before performing the Servo Oxygen portions of the Service Checkout procedures in this section of this document. When mounted to the Incubator unit, electrically powered accessories must be plugged in using the IEC accessory outlets provided on the back of the Incubator unit. During installation, it is necessary to remove the plug retaining bracket. Be sure to install the plug retaining bracket as shown in “Power Cord Condition” on page 1-1 of this document.  ! !  Warning: Do not perform the service checkout procedure while the patient occupies the device. Warning: Complete the service checkout procedure section of this manual before putting the device into operation. If the equipment fails any portion of the checkout procedure it must be removed from use and repaired.  1.2 Service Checkout  !  Warning: The use of accessories, replacement parts, or power cords other than those specified by the manufacturer may affect the performance of the device and could result in damage to the device or unsafe operating conditions.  !  Warning: Insulation on electrical wiring can deteriorate with age. Check for brittle or deteriorated insulation on power cord and all other electrical wiring.  Note: All steps required to complete the pre-use checkout are included in the Service Checkout Procedures.  1.2.1 Mechanical Checks The following procedures verify that the device is operational and ready to be used. 1.2.1.1 Power Cord Condition To verify the condition of the power cord: 1. 2. 3.  Disconnect the power cord from the power outlet. Examine the power cord for signs of damage. If damage is evident, replace the cord. Do not put in service. Consult authorized service personnel. Verify that the plug retaining brackets for the power cord and the accessory outlets on the back of the device are placed.  5877603 Rev 2 Giraffe Incubator Service Checkout Procedure  1-1
File Type: PDF
File Size: 560 KB
File Name: Giraffe Incubator Service Checkout Procedure Rev 2.pdf

By clicking Download you are confirming this is the correct document for your purposes
and that you agree to our Terms & Conditions