Verity Medical
NeuroTrac Sports XL Operation Manual Aug 2002
Operation Manual
32 Pages
Preview
Page 1
NeuroTrac™ Sports XLUNIT Operation Manual DUAL CHANNEL STIM
NeuroTrac™ Sports XL
Operators Manual Visit our website: www.VerityMedical.co.uk for detailed application protocols
1
NeuroTrac™ Sports XL Operation Manual
Warnings *
This unit must be used with the guidance of a Physiotherapist or Doctor
*
Type BF equipment
*
Do not insert lead wires into a mains power supply
*
Do not immerse unit into water or any other substance
*
Do not use the NeuroTrac™ Sports XL STIM unit in the presence of a flammable anaesthetic gas mixture and air or with Oxygen or Nitrous Oxide
*
If using rechargeable 9 volt PP3 Nickel Metal Hydride or Ni-Cad batteries be sure to use a CE approved battery charger
*
Never connect the NeuroTrac™ Sports XL STIM device directly to a battery charger or any other mains powered equipment
*
Patient Electrodes are for single patient use only
*
Keep out of reach of children
*
Do not use this stimulator on your face unless under the guidance of a clinician
Revised Issue Date: 12/08/2002 Document Number ETS201-OM002-0 2
NeuroTrac™ Sports XL Operation Manual
Contents Contents
Page
Warnings What is STIM? Contra Indications & Precautions Description of STIM Unit & Functions Quick Start Instructions Lock Button Sports Treatment Programmes Electrode Types & Tips Care & Maintenance Applications Specifications Warranty Clinical References
2 4 5 6 8 10 11 23 24 25 26 27 28
3
NeuroTrac™ Sports XL Operation Manual
What is STIM? Neuromuscular Stimulation has been used for many years to stimulate muscle and nerve fibres to treat a number of muscle and nerve related conditions. Over the last 30 years numerous clinical trials and papers have been written. The NeuroTrac™ Sports XL is one of a new breed of modern Neuromuscular stimulators which Verity Medical have developed with the Therapist and Patient in mind. Our principle aim is to design products that have high levels of functional use, are sensibly priced, compact and user friendly. The NeuroTrac™ Sports XL is a dual channel device (with 2 lead wires for each channel giving a total of 8 electrode positions) combining several treatment programmes into one unit. Neuromuscular Stimulation is increasingly understood by Therapists and Doctors. There is a better understanding of the mechanisms which exist between nerves and muscles that make it possible to stimulate the neuromuscular system with precise electrical signals. The NeuroTrac™ Sports XL offers precision giving full control of Pulse Widths, Rates, Ramp up times, Work / Rest cycles as well as alternating or synchronous application if two channels are being applied. Customer Care We welcome constructive comments regarding our equipment particularly those that might help us to improve existing features, add new ones or develop new products for the future.
4
NeuroTrac™ Sports XL Operation Manual
Contra Indications & Precautions Before using this equipment you must first seek the advice of your Physiotherapist or Doctor. Read this operating manual before using the STIM unit STIM should not be used: *
By patients fitted with a demand style cardiac pacemakers unless so advised by their Doctor
*
During pregnancy [unless medically advised]
*
By patients with undiagnosed pain conditions
*
With patients who have diminished mental capacity or physical competence who cannot handle the device properly
*
On anaesthetised or desensitised skin
*
When driving a vehicle or operating potentially dangerous equipment
*
Do not place electrodes: * Over carotid sinus nerves * Over larynx or trachea * Inside mouth * Over the area of the heart unless so advised by your Doctor * On the face unless under the guidance of a clinician
*
The patient should use the unit only as prescribed
*
Do not immerse the unit in water or any other liquid
*
Keep unit out of reach of children
5
NeuroTrac™ Sports XL Operation Manual
Description of STIM Unit & Functions
Channel A
Channel B (2 Lead wires per channel)
CHB
CHA
LCD Display
Lead Wire and Pin Select Programme
Lock
SET
NeuroTrac™ Sports XL
Front
Rear
* PRG button
Selects the desired set programme from P01 - P21 or customised programme PC1 - PC3. Pauses (reducing the intensity (MA) to zero) and escapes from a running programme.
* SET button
Reduces the intensity (MA) to zero and pauses the programme (if a programme is running) and moves the phase one step forward. Displays the menu for programmes PC1 - PC3 and allows the parameters for Time, Work, Rest, Ramp up time, CH.A / CH.B Synchronous or Alternating and delay to be set.
6
NeuroTrac™ Sports XL Operation Manual
Lock symbol
Frequency & Current phase / pulse width of phase phase indicator 5 Hz 300 uS
Programme Total programme time
Low battery indicator
P08
•Work •Rest •Alt •Cont •Mod
Number of phases
35 : 5
Time of current phase
Min
Min
Phase mode
0
0
Channel A milliamps
Channel B milliamps
MA
MA
Example of preset programme Phase being set 3 Hz 250 uS Programme
PC1
•Work •Rest •Alt •Cont •Mod
5 : WK Total programme time adds cumulatively as time added to phases
Min
4
Phase mode
Number of phases Current setting being altered (work in this example)
SEC
Set Work / Rest / Ramp / Delay seconds Example of custom programme 7
NeuroTrac™ Sports XL Operation Manual
Quick Start Instructions 1.
2.
3. 4.
5. 6. 7.
Insert a 9 volt PP3 Alkaline battery. Alternatively insert a rechargeable Nickel Metal Hydride battery {which has a much longer life than the Ni-Cad rechargeable batteries} into the battery compartment. Insert lead wire/s in to Channel A and B, if you are using two channels. You may use up to four sets of lead wires, two for channel A and two for channel B giving either 4 or 8 electrode placements on the body. [Ivory = Channel A, Black = Channel B] Switch on the unit by pressing the on/off button on the front of the unit. Press the PRG button to select one of the pre-set programmes P01 P21 outlined in the tables on page 11 to 21 or PC1 - PC3 for the customised programmes (see page 9 for setting customised programmes). You can press the set button to change to the next phase of the current programme if required. To start the programme, press channel A + and / or B + if you are using both channels, then increase the mA intensity to the desired level. To stop the programme press the on/off button which will turn the unit off or alternatively press the PRG button twice to return to the home screen.
Low Battery Indicator When the battery power is low, the low battery indicator will appear on the screen (shown in the diagram on page 7). When the battery indicator shows one bar, replace the battery. Electrode Disconnection Indicator When an electrode becomes disconnected or when an electrode no longer conducts the electrical current or if the lead wires are faulty, the milliamp level will return to zero and the effected channel will flash on and off. Setting up the Customised Programmes PC1, PC2 or PC3 First, if a programme is running, press the PRG button twice to return to the home screen. Refer to the example of custom programme diagram on page 7.
8
NeuroTrac™ Sports XL Operation Manual
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.
Press the PRG button until PC1, PC2 or PC3 is selected. Press and hold the SET button for three seconds, the phase indicator arrow and Hz symbol will flash on and off. Press CH.B +/- to set the frequency between 2 Hz and 100 Hz. Press CH.A +, the µS symbol will flash, press CH.B +/- to set the pulse duration between 50 µS and 450 µS. Press CH.A +, the MIN symbol will flash, press CH.B +/- to set the length of the phase time between 1 and 99 minutes. Set the time to zero to end the programme on this phase. Press CH.A +, the WORK / REST or the CONT symbols will flash, Press the CH.B +/- to select WORK / REST or CONT (continuous). Note: if continuous is selected, the menu will loop back to step 2. Press CH.A +, WK will appear and flash, press CH.B +/- to set the work seconds between 2 and 99 seconds. Press CH.A +, RT will appear and flash, press CH.B +/- to set the rest seconds between 2 and 99 seconds. Press CH.A +, RP will appear and flash, press CH.B +/- to set the ramp seconds between 0.1 and 9.9 seconds. Press CH.A +, AL or SY will appear and flash, press CH.B +/- to select alternating or synchronous current. Note: if alternating is selected, the menu will loop back to step 2. Press CH.A +, DY will appear and flash, press CH.B +/- to set the delay of channel B starting between 0 and 4 seconds after channel A. The menu will now loop back to step 2 and the Hz symbol will flash. To set the next phase, press the set button. The phase symbol will flash over the next phase, continue with step 2 to set this phase. When finished setting the phases, press the PRG button to save the settings and return to the home screen. The programme will be saved permanently.
Setting the phase time of phase 2,3,4 or 5 to zero will cause the programme to end at that phase. Following procedures 1 to 12 can reprogramme a customised programme. If for example there are 5 pre-set phases in one overall programme and only 4 phases are now required, input 0 (zero) into the phase time that is no longer required and press the PRG key to store the new information.
9
NeuroTrac™ Sports XL Operation Manual
Lock Button Frequency & pulse width of phase
Lock symbol (flashes when being unlocked)
5 Hz 300 uS
P08 Programme Hours and minutes unit was used in the locked mode
•Work •Rest •Alt •Cont •Mod
Phase mode
Number of phases
35 : 05 Min
30
20
MA
Average milliamps CH.A
Minutes
MA
Average milliamps for CH.B
A "concealed" lock button is included in the NeuroTrac™ Sports XL which allows the clinician to accurately monitor "Home Compliance" of the patent between appointments. It records the time in use and the average intensity (MA). It also locks the customised programmes, stopping them from being altered. To Lock the Unit 1. Select the pre-set or customised programme required. In the case of a customised programme, make sure that the pulse width, frequency, time etc. are set-up correctly. 2. Remove the battery cover and, using a thin rod gently press on the lock button as shown in the diagram on page 6 until you hear a double beep. The unit is now “locked” and cannot be altered until “unlocked”. Note: The lock symbol will appear on the LCD when the unit is “locked”. To Unlock the Unit Remove the battery cover and press the concealed switch with a thin rod until a single beep is heard. Now the LCD will display the average mA used on each channel and the total hours and minutes the unit has been in use as shown in the diagram. To return to normal "unlocked" operation, simply press SET.
10
NeuroTrac™ Sports XL Operation Manual
Sports Treatment Programmes Programme : P01 Phase time
Warm up
Phase 1
min
6
Mode
Phase 2
Phase 3
Phase 4
Phase 5
C ont
Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Modulation time
secs
Ramp up time
secs
Ramp down time
secs
Work time
secs
Rest time
secs
5
300
Alternating Synchronous O verall time
* 6 min
Used before starting strenuous physical activity. Activates the metabolism, increases the muscle/s temperature and oxygenates the muscle by speeding up blood flow .
Programme: P02 Phase time
Capillary min
Mode
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
20 C ont
Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Modulation time
secs
Ramp up time
secs
Ramp down time
secs
Work time
secs
Rest time
secs
10
250
Alternating Synchronous O verall time
* 20 min
Developing the capillary bed density system surrounding the muscle fibres to improve the resistance qualities of the fast glycolytic muscle twitch fibres and its recovery. Used for all type of sports activities
11
NeuroTrac™ Sports XL Operation Manual
Programme: P03 Phase time
Endurance min
Mode
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
50 W/R
Frequency work
Hz
Frequency rest
Hz
20 3
Pulse duration
µS
300
Modulation time
secs
Ramp up time
secs
2
Ramp down time
secs
1.5
Work time
secs
10
Rest time
secs
10
Alternating Synchronous O verall time
* 50 min
Improving the capacity to sustain long periods of aerobic muscle activity. Developing the efficacy of oxygen muscle consumption and storage of glycogen in the fast twitch fibre white muscle.
Programme: P04
Phase time
R e s is tance force output 1
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
min
5
12
7
10
16
C ont
W/R
C ont
W/R
C ont
5
50
5
50
5
Mode Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Modulation time
secs
Ramp up time
secs
5 300
300
5 300
2
300
300
2
Ramp down time
secs
2
2
Work time
secs
8
8
Rest time
secs
8
8
Alternating Synchronous O verall time
*
*
*
*
*
50 min
Increasing the capacity to habitually develop a high level of muscle force. Improving oxygen consumption at muscular level and to increase the capacity to withstand toxin amassing. Used on sports activities requiring prolonged and high levels of muscle force: C ycling, Rowing, Middle distance running
12
NeuroTrac™ Sports XL Operation Manual
Programme: P05
R e s is tance force output 2
Phase time
min
Mode Frequency work
Hz
Frequency rest
Hz
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
5
12
5
12
6
C ont
MF
C ont
MF
C ont
5
50- 75
5
40- 75
3
3 300
300
3
Pulse duration
µS
Modulation time
secs
10
300
300 10 2
Ramp up time
secs
2
Ramp down time
secs
1
1
Work time
secs
10
10
Rest time
secs
8
8
300
Alternating Synchronous
*
O verall time
*
*
*
*
40 min
Improving and increasing the capacity to develop very high level of muscle force over a long period of time. Improving the efficacy of the oxygen consumption at the muscle level and the capacity to with stand toxin accretion, such as lactic acid. For sports activities that require very high levels of prolonged muscle activity: Rowing, C ycling, Middle distance running.
Programme: P06
R e s is tance force output 3
Phase 1
Phase 2
Phase 3
Phase 4
min
5
10
10
12
Cont
MF
MF
Cont
5
40- 60
45- 75
5
3
3
300
300
10
10
Phase time Mode Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Modulation time
secs
300
Ramp up time
secs
2
2
Ramp down time
secs
1.2
1.2
Work time
secs
10
10
Rest time
secs
4
4
*
*
300
Alternating Synchronous O verall time
* 37 min
Same as Programme 5
13
*
Phase 5
NeuroTrac™ Sports XL Operation Manual
Programme: P07
Phase time
M aximum force output min
Mode Frequency work
Hz
Frequency rest
Hz
Phase 1
Phase 2
Phase 3
5
20
10
C ont
W/R
C ont
5
75
2
Phase 4
Phase 5
3
Pulse duration
µS
Modulation time
secs
300
300
Ramp up time
secs
Ramp down time
secs
1
Work time
secs
5
Rest time
secs
12
250
1.5
Alternating Synchronous O verall time
*
*
*
35 min
Developing the muscle to cope with and produce maximum muscle force output, and to develop muscle bulk. Used in activities of Anaerobic activity. Used in sports such as weight lifting, Judo, Ball games, sprint running and cycling.
Programme: P08
Phase time
Explos ive force output min
Mode Frequency work
Hz
Frequency rest
Hz
Phase 1
Phase 2
Phase 3
5
15
15
C ont
W/R
C ont
5
90
10
Phase 4
Phase 5
3
Pulse duration
µS
Modulation time
secs
300
250
Ramp up time
secs
2
Ramp down time
secs
1.5
Work time
secs
6
Rest time
secs
6
250
Alternating Synchronous O verall time
*
*
*
35 min
Anaerobic activity- increasing the muscle capacity to a level of instantaneous maximum muscle force, changing muscle force into explosive action. Used for all activities requiring maximum muscle output in a very short space of time, such as Judo, short distance sprinting, throwing the discuss or shot put.
14
NeuroTrac™ Sports XL Operation Manual
Programme: P09
Phase time
Lipolys is Anti Ce llulite min
Mode
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
5
5
5
5
5
C ont
W/R
C ont
W/R
C ont
2
30
50
30
50
Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Modulation time
secs
Ramp up time
secs
1.5
1.5
3 250
3
250
150- 250
250
150- 250
3
3
Ramp down time
secs
1.2
1.2
Work time
secs
7
7
Rest time
secs
7
7
Alternating Synchronous O verall time
*
*
*
*
*
25 min
Increasing the flow of blood circulation, and modifying the metabolism of the lipocytes. To help stimulate the subcutaneous deposits of fat. To assist reduce or eliminate the O range Peel effect of the skin surface.
Programme: P10 Phase time
M us cle at R e s t min
Mode Frequency work
Hz
Phase 1
Phase 2
Phase 3
20
20
10
MF
MF
W/R
2- 5
5- 10
10
200
Frequency rest
Hz
Pulse duration
µS
150- 250
150- 250
Modulation time
secs
10
10
Phase 4
Phase 5
3
Ramp up time
secs
2
Ramp down time
secs
2
Work time
secs
10
Rest time
secs
10
Alternating Synchronous O verall time
*
*
*
50 min
To help improve recovery after high levels of training and to reduce the possibilities of muscle contraction commonly know as Cramp. Used after intense levels of sporting activity and completions in particular.
15
NeuroTrac™ Sports XL Operation Manual
Programme: P11 Phase time
M as s M us cle Contraction
Phase 1
min
Mode Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Phase 2
Phase 3
5
15
10
C ont
W/R
C ont
5
60
2
Phase 4
Phase 5
3 300
350
Modulation time
secs
Ramp up time
secs
2
Ramp down time
secs
1.5
Work time
secs
7
Rest time
secs
14
250
Alternating Synchronous O verall time
*
*
*
30 min
To increase muscle bulk and volume and to improve muscle force. Searching for muscular hypertrophy.
Programme: P12 Phase time
Active R e cove ry
Phase 1
Phase 2
min
10
25
Cont
Cont
2
2- 10
250
150- 250
Mode Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Modulation time
secs
Ramp up time
secs
Ramp down time
secs
Work time
secs
Rest time
secs
Phase 3
Phase 4
10
Alternating Synchronous O verall time
*
*
35 min
To help improve muscle recovery after prolonged activity, helps to rid the system of toxin waste. Used 10 to 24 hours after prolonged activity.
16
Phase 5
NeuroTrac™ Sports XL Operation Manual
Programme: P13 Phase time
R e s ume Training
Phase 1
min
Mode Frequency work
Hz
Frequency rest
Hz
Phase 2
Phase 3
Phase 4
Phase 5
5
15
10
15
5
C ont
W/R
W/R
W/R
C ont
10
20
30
20
5
3
3
3
300
300
300
Pulse duration
µS
Modulation time
secs
250
Ramp up time
secs
2
2
2.5 1.8
Ramp down time
secs
1.8
1.8
Work time
secs
6
10
6
Rest time
secs
10
10
10
*
*
*
250
Alternating Synchronous O verall time
*
*
50 min
To promote the slow twitch fibres to build muscle strength to help reduce muscle atrophy ready for resuming training activities. Used for all type of sports.
Programme: P14 Phase time
M us cle Toning
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
min
5
3
3
2
2
C ont
W/R
W/R
W/R
W/R
5
75
50
75
50
3
3
3
3
250
300
300
250
3
2
3
2
Mode Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Modulation time
secs
Ramp up time
secs
250
Ramp down time
secs
2
1.5
2
1.5
Work time
secs
4
6
4
6
Rest time
secs
10
10
10
10
*
*
*
*
Alternating Synchronous O verall time
* 15 min
Strengthening the muscles, improving blood circulation and capillary bed density. Ideal for applying to the Thigh, Legs, Bottom and Abdomen.
17
NeuroTrac™ Sports XL Operation Manual
Programme: P15 Phase time
Calming the M us cle min
Mode
Phase 1
Phase 2
Phase 3
25
20
10
C ont
C ont
W/R
2 - 10
5- 15
10
150
Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
150- 250
150- 250
10
10
Phase 4
Phase 5
3
Modulation time
secs
Ramp up time
secs
Ramp down time
secs
2
Work time
secs
10
Rest time
secs
10
2
Alternating Synchronous O verall time
*
*
*
55 min
Relaxing the muscles as much as possible and to promote the bodies natural endorphins to promote pain relief and to improve the blood circulation and provide oxygen into the muscle. Used on the Trapezius , Deltoid area of the shoulder, upper and lower Trapezius and neck area.
Programme: P16 Phase time
Pain R e lie f
Phase 1
min
40
Mode
MF
Frequency work
Hz
1- 150
Frequency rest
Hz
Pulse duration
µS
250
Modulation time
secs
10
Ramp up time
secs
Ramp down time
secs
Work time
secs
Rest time
secs
Alternating Synchronous O verall time
* 40 min
Reduces uncomfortable pain. 18
Phase 2
Phase 3
Phase 4
Phase 5
NeuroTrac™ Sports XL Operation Manual
Programme: P17 Phase time
Ce llulite
Phase 1
min
30
Mode
Phase 2
Phase 3
Phase 4
Phase 5
Phase 2
Phase 3
Phase 4
Phase 5
Cont
Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Modulation time
secs
Ramp up time
secs
Ramp down time
secs
Work time
secs
Rest time
secs
2
250
Alternating Synchronous O verall time
* 30 min
Reduces fat cells.
Programme: P18
Phase time
Explos ive Stre ngth Le ve l 1
Phase 1
min
35
Mode
W/R
Frequency work
Hz
60
Frequency rest
Hz
2 220
Pulse duration
µS
Modulation time
secs
Ramp up time
secs
1.5
Ramp down time
secs
1.5
Work time
secs
4
Rest time
secs
30
Alternating Synchronous O verall time
* 35 min
Please see Programme notes on page 21 19
NeuroTrac™ Sports XL Operation Manual
Programme: P19
Phase time
Explos ive Stre ngth Le ve l 2
Phase 1
Phase 2
Phase 3
min
20
10
10
Cont
W/R
Cont
5
70
5
Mode Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Modulation time
secs
Phase 4
Phase 5
Phase 4
Phase 5
2 220
220
Ramp up time
secs
1.5
Ramp down time
secs
1.5
Work time
secs
4
Rest time
secs
30
220
Alternating Synchronous O verall time
*
*
*
Phase 2
Phase 3
40 min
Please see Programme notes on page 21
Programme: P20
Phase time
Explos ive Stre ngth Le ve l 3 min
Mode
Phase 1 20
10
10
Cont
W/R
Cont
5
80
5
220
220
Frequency work
Hz
Frequency rest
Hz
Pulse duration
µS
Modulation time
secs
Ramp up time
secs
1.5
Ramp down time
secs
1.5
Work time
secs
4
Rest time
secs
30
2 220
Alternating Synchronous O verall time
* 40 min
Please see Programme notes on page 21 20
*
*